Why Most Lenders Won't Finance 100% LTC Loans
Many developers and business owners begin their search for project capital by looking for 100% LTC loans, meaning a loan that covers the entire cost of a project with no cash from the borrower. The appeal is obvious. If a lender would fund every dollar of land, hard costs, and soft costs, the sponsor could preserve capital for other opportunities.
At Commercial Funding International (CFI), we believe our Clients are best served by a candid answer. Lenders that will provide a true 100% loan to cost construction loan are rare, and the terms attached to such offers deserve careful scrutiny. CFI does not offer 100% LTC financing. This article explains why funders expect the borrower to contribute equity, what level of leverage is realistic through our Lender/Investor network, and the practical ways a sponsor can close the equity gap.
What Loan-to-Cost Means
Loan-to-cost (LTC) compares the amount of a loan to the total cost of a project. Total cost usually includes land or property acquisition, hard construction costs, soft costs such as architecture, engineering, permits, and legal fees, financing costs, and reserves. If a project costs 20 million dollars and the senior lender provides 15 million dollars, the loan is at 75% LTC.
Loan-to-value (LTV) is a related but different measure. It compares the loan to the appraised value of the property, often the value upon completion or stabilization. A lender may review both ratios, and the more conservative of the two typically governs the loan amount.
When a borrower asks for 100% financing on commercial real estate, the request is for a loan equal to all of the project’s cost. In practice, that means the lender carries all of the risk while the sponsor carries none of the cash exposure.
Why Lenders Require Borrower Equity
Equity Absorbs Risk First
In any capital structure, equity sits beneath the debt. If a project encounters trouble and must be sold or refinanced at a lower value, the equity is lost before the lender’s principal is impaired. The equity contribution is the lender’s cushion. Without it, any decline in value, delay in lease-up, or shift in market conditions falls directly on the lender.
Construction Projects Carry Cost Overrun Risk
Development budgets are estimates. Materials pricing, labor availability, weather, permitting, and design changes can all increase costs during construction. A lender that has already funded the full budget has no room left to absorb an overrun, and a project that cannot be completed is worth far less than a finished one. Borrower equity, contingency reserves, and completion guarantees are the tools lenders rely on to make sure a project reaches the finish line.
Lender and Regulatory Limits
Banks, insurance companies, and many institutional funds operate under internal credit policies and, in the case of regulated institutions, supervisory guidelines that limit leverage on construction and development loans. A loan officer who wants to approve a project generally cannot exceed those limits. Private Lender/Investors have more flexibility, but they also answer to their own investors and set their leverage limits accordingly.
Alignment of Interests
Lenders want the sponsor to have meaningful capital at risk, often described as “skin in the game.” A sponsor with cash in the project has every reason to manage the budget, the schedule, and the lease-up with discipline. A sponsor with nothing invested has far less to lose by walking away. That difference in incentives is one of the most important reasons funders insist on borrower equity.
A Word of Caution About 100% Financing Offers
Borrowers who search for 100% LTC loans will find advertisements that appear to promise full financing. We encourage Clients to read the terms closely. Such offers may depend on conditions that effectively require the borrower to contribute value in another form, carry substantially higher pricing, require large upfront fees, or rely on structures that do not close as described. Any credible funding proposal should state clearly what the borrower must contribute and what the Lender/Investor will provide.
What Is Realistic Through CFI
CFI arranges commercial and project financing from $1MM to $5 Billion or more in the USA and USA-friendly countries. Through our network, senior debt is generally available at up to 75% of cost or value, depending on the project, the sponsor, and the Lender/Investor. When senior debt is combined with equity sourced from our network, total financing can reach up to 90% of the capital stack for qualified projects. The sponsor’s own contribution is still required, and every request is subject to the Lender/Investor’s review and approval.
Our private funding sources lend against the strength of the project and can consider transactions a bank may decline. Our commercial real estate development sources provide acquisition and construction financing, mezzanine financing, participating and subordinated debt, equity capital, and joint ventures. The full range of options is outlined on our funding solutions page.
Ways to Close the Equity Gap
A sponsor who cannot fund the full equity requirement in cash still has options. The right combination depends on the project and the parties involved.
Joint Venture Equity
A joint venture pairs the sponsor with an equity partner for a specific project. The partner contributes capital in exchange for a share of the profits, which reduces the amount of the sponsor’s personal capital at risk. In some cases, joint venture financing may be the only way to get a project funded. Our guide to joint venture financing for commercial real estate explains how these partnerships are typically structured.
Mezzanine Financing or Preferred Equity
Mezzanine debt and preferred equity sit between the senior loan and the sponsor’s common equity. They cost more than senior debt because they carry more risk, but they can substantially reduce the cash the sponsor must contribute. The senior lender must approve any subordinate financing, and an intercreditor agreement usually governs the relationship.
Land or Existing Asset Value as Equity
A sponsor who already owns the land, or owns it free and clear, may be able to have its documented value credited toward the equity requirement. Lenders differ on how they value contributed land, often relying on an appraisal or the original cost basis, so documentation matters. Other assets may also support a financing; our asset-based loans guide explains how documented collateral can be used.
Seller Financing
When a project includes an acquisition, the seller may agree to carry part of the purchase price as a note. Senior lenders generally require that note to be subordinate, and some limit how much seller financing they will accept, but it can reduce the cash required at closing.
PACE and Public Incentives, Where They Genuinely Apply
In some jurisdictions, Commercial Property Assessed Clean Energy (C-PACE) programs, tax credits, grants, or other public incentives may fund qualifying portions of a project. Availability and eligibility vary widely by location and project type, and these sources should be counted only when they are actually approved for the project.
How to Present a Request With Confidence
Lender/Investors respond best to a sponsor who presents a realistic capital stack. A strong request shows the total project cost, the amount of senior debt requested, the sponsor’s equity contribution and its source, any additional equity or subordinate financing needed, the development team’s experience, and the exit or repayment strategy. Our guide on how to write an executive summary for a commercial loan request walks through each element, and The Process page describes how CFI reviews a project. Sponsors comparing short-term options may also find our article on bridge loans vs. hard money loans helpful.
Frequently Asked Questions
Can I get a 100% LTC construction loan?
True 100% loan to cost construction loans are rare because lenders expect the borrower to contribute equity that absorbs risk and cost overruns. CFI does not offer 100% LTC financing. Through our network, senior debt is generally available at up to 75%, and up to 90% combined with network equity for qualified projects.
Why do lenders require skin in the game?
Borrower equity protects the lender if the project’s value declines or costs rise, and it aligns the sponsor’s interests with the lender’s. Regulated lenders also operate under leverage limits on construction and development loans.
What is the difference between LTC and LTV?
Loan-to-cost compares the loan to the total cost of the project. Loan-to-value compares the loan to the property’s appraised value. Lenders often review both, and the more conservative ratio typically governs the loan amount.
How can I reduce the cash equity I need?
Common approaches include joint venture equity, mezzanine financing or preferred equity, credit for land or other assets you already own, seller financing, and public incentives or C-PACE where they genuinely apply.
Can land I already own count as equity?
Often it can, if its value is well documented. Lenders differ in how they value contributed land, typically using an appraisal or the original cost basis.
How do I start a funding request with CFI?
Please email a 1 to 5 page Executive Overview describing the project, the total cost, the amount requested, and your equity contribution, or feel free to call us first at (503) 245-2789.
Discuss Your Project With CFI
If your project needs more leverage than a conventional lender will provide, CFI can review it and identify a realistic structure through our network of more than 115 Lender/Investor entities. Please email us a 1 to 5 page Executive Overview through our contact page, or feel free to call us first at (503) 245-2789.